Job Description
Responsible for the safe off-loading of Major Components Assemblies (MCA) from sea and road transport jigs onto Final Assembly Line (FAL) transportation trolleys and the delivery of MCAs to the Final Assembly Line stations in accordance with the planning schedule. Safe operations of Overhead Cranes with lifting capacities ranging from 6.5 tons to 50 tons, all with multiple lifting configurations.
Qualifications
Education:
Experience:
Qualified Experience / Skills / Training:
Additional Information
Here’s a heads-up of the upcoming steps:
This position is a temporary (contract) position with no specific time period but could be extended or shortened as needed. Contractors are employed by a Segula Technologies and placed on assignment at our client´s facility