Project Scheduler

Oakmont Contracting LLC

Project Scheduler

Columbia, MD +1 location
Full Time
Paid
  • Responsibilities

    Job Description

    Job Description

    Project Scheduler

    The Senior Scheduling and Claims Consultant will be responsible for developing, maintaining,
    monitoring and reviewing CPM schedules, conducting impact analysis, analyzing risk on complex
    projects, performing forensic schedule and cost analysis, and interacting with clients.

    Essential Functions

    • Create comprehensive schedules, utilizing Critical Path Methodology (CPM), resource, and cost loading as necessary using industry-accepted best practices and the company’s quality standards.
    • Maintain and manage multiple complex project schedules, to include periodic tracking and status updates
    • Support clients in the identification, quantification, and mitigation of schedule-related risks
    • Perform schedule assessments, including reviews of critical path, schedule content, use of relationships and lag, constraints and milestones, constructability, and general assessment based on industry knowledge
    • Perform construction claims forensic analysis, including document review and organization, key issue identification, schedule analysis, labor productivity studies, general conditions calculations, pricing, and graphic exhibits for input to expert reports
    • Analyze construction project cost reports, labor distribution reports, and other project accounting information
    • Knowledge of Critical Path Method Scheduling
    • Construction Industry Experience
    • Demonstrates skill in identifying, analyzing, and solving problems
    • Proficient user of a computer and Microsoft Office
    • Ability to prioritize and manage multiple tasks, changing priorities as necessary
    • Ability to work under time pressure and adapt to changing requirements with a positive attitude
    • Ability to be self-motivated, proactive, and an effective team player
    • Ability to interact effectively and professionally with all levels of employees, both management and field staff alike. Also with subcontractors, vendors, clients.
    • Ability to develop CPM Construction Schedules. Incorporate changes to schedule baselines and perform monthly updates
    • Knowledge of earned value methodology, scope control and change management
    • Ability to create Time Impact Analysis to track project delays
    • Familiar with basic cost analysis and forecasting as it relates to planning and scheduling
    • Ability to read, understand, construction blueprints and specifications to be used for schedule development
    • Ability to resource load and cost load schedules
    • Able to work in a fast paced environment
    • Have strong written and verbal skills
    • Expert level experience with Primavera P6

    Required Education and Experience

    • 5+ years of hands-on scheduling and claims experience in the construction industry
    • Strong understanding of the Critical Path Method of scheduling theoretically and as it applies to construction projects
    • Ability to understand and accurately interpret construction documents (drawings, specifications, contracts/general conditions) at all levels of design across project types and trade disciplines
    • Expert user in Primavera P6, Microsoft Project, and Microsoft Office Suite
    • Experience in schedule delay principles and techniques
    • Strong preference for construction field experience
    • AACEI and PMI certifications a plus
  • Locations
    Columbia, MD • Baltimore, MD