Project Scheduler

Roeslein & Associates

Project Scheduler

Indianapolis, IN +3 locations
Full Time
Paid
  • Responsibilities

    Roeslein & Associates is a global leader in engineering, manufacturing, and construction services, specializing in modular, pre-fabricated solutions for the energy, beverage, and industrial sectors. With a focus on safety, innovation, and sustainability, Roeslein delivers turnkey project execution from concept to commissioning. Our team is driven by a commitment to quality and client success, operating across North America, South America, Europe, and Asia. Visit our website to learn more: __Roeslein & Associates - Global EPC Services & Solutions .

    Position Summary: The Project Scheduler is responsible for performing project controls on multiple engineering and construction projects, including planning, estimating, forecasting, scheduling, cost control, schedule control, and project reports.

    Essential Duties and Responsibilities:

    • Develop, maintain, and update project schedules to align with project goals and deadlines.
    • Provide enterprise-wide scheduling and reporting.
    • Support Project Managers and Project Coordinators by building and maintaining baseline schedules, including resource planning and cost analysis.
    • Identify scheduling risks, track project progress, and provide solutions to keep projects on track.
    • Integrate schedules from multiple projects for a company-wide overview.
    • Create design-build schedules and ensure smooth coordination with project teams.
    • Train and mentor project teams on scheduling tools and best practices.
    • Assist in project planning, including estimating, forecasting, and cost control.
    • Generate reports and performance metrics for management review.
    • Work with manufacturing facilities to coordinate fabrication schedules and resource planning.
    • Travel domestically and internationally (20-30% per year).
    • Foster strong working relationships across all locations.
    • Ensure compliance with safety and company requirements.

    Other Duties and Responsibilities:

    • Promote a positive working environment in order to achieve the organization’s goals.
    • Perform other duties as assigned.

    Skills/Knowledge/Ability/Education/Experience:

    • Minimum of 5 years of project scheduling experience, preferably supporting engineering or construction teams.
    • A degree is not required, but a bachelor’s in Engineering, Construction Management, or a related field is preferred.
    • Proficiency in Primavera, Microsoft Project, or other project management software (required).
    • Experience creating and managing design-build schedules is a plus.
    • Proficiency in all Microsoft Office programs and experience with web-based applications.
    • Excellent written and verbal communication skills.
    • The ability to work both independently and in a team setting.
    • Strong attention to detail and a commitment to accuracy.
    • A team player with problem-solving skills and the ability to collaborate effectively with colleagues, clients, vendors, and other stakeholders.
    • Must uphold Roeslein & Associates’ core values to support a safe, efficient, and respectful work environment.

    We Take Care of Our Team

    • Health insurance plans for you and your family
    • HSA (Health Savings Account) with up to $1,500 company match per year
    • FSA (Flexible Spending Account)
    • Dental/Vision/Life insurance
    • 40(k) + Employee Stock Ownership Plan (ESOP)
    • Paid Sick Leave
    • 10+ Paid Vacation Days
    • 8+ Paid Holidays
    • 5 Paid Sick/Personal Days
    • Education, Certification, and Tuition Reimbursement
    • Paid Parental Leave
    • $25,000 Company-Paid Life Insurance
    • Annual bonus up to 10% based on individual and company performance

    __

    Roeslein & Associates is an Equal Opportunity Employer.

    The job description does not necessarily contain all of the actual or essential duties of this position. All job offers are contingent upon passing a drug screen and criminal background check.

    Required Skills

    Required Experience

  • Locations
    Santa Fe Springs, CA • Indianapolis, IN • Arlington, TX • Denton, TX