- Worked on embedded control systems for the Boeing 737, 747-400, and 777X commercial aircrafts while as a contract employee
- Served as a software tester to work on embedded control systems
- Developed high quality software using the waterfall-based development process
- Used legacy Unix systems for simulation testing
- Boeing 777X, Hydraulic Interface Module (HYDIM) and Environmental Control System Miscellaneous Card (ECSMC
- Developed and processed data through the ASG Cards and the System ARINC 629 Buses
- Established low level tests and achieved structural coverage for modules used in the program and created high level tests to test interfacing for code modules
- Successfully updated modules for the program and reviewed tests to assure that the files were working correctly
- Boeing 737, Stall Management Yaw Damper (SMYD
- Reviewed tests to assure that the tests were working correctly
- Boeing 747, Modular Avionics Warning Electronic Assembly (MAWEA
- Signature Reviewer
- Assured the requirements traced to the modules and tests were correct
- Assessed the specifications used for testing and coding to check if there were any mistakes